• <sup id="1zmse"><input id="1zmse"></input></sup>
          <label id="1zmse"><samp id="1zmse"></samp></label>
          <blockquote id="1zmse"></blockquote><label id="1zmse"></label>
          国产在线观看免费人成视频,国产欧美久久久精品影院,精品国产一区二区三区国产区,免费毛片在线播放中文,亚洲制服丝袜av一区二区三区,久久人搡人人玩人妻,国产一区二区四区不卡,亚洲夂夂婷婷色拍WW47
          您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

          服務熱線

          當前位置: 首頁- 新聞中心 > 客戶見證
          常見問題
          新聞中心

          濟南機箱機柜安裝務必要需要關注的三個大項和34個小項

          發布時間:2025-12-17 來源:http://m.cr4.com.cn/ 瀏覽量:

            一 機柜安裝要求一 機柜安裝要求1、 機柜安裝前必須檢查機柜排風設備是否完好,設備托板數量是否齊全以及滑輪、支撐柱是否完好等

            Installation requirements for one cabinet: 1. Before installing the cabinet, it is necessary to check whether the exhaust equipment of the cabinet is intact, whether the number of equipment pallets is complete, and whether the pulleys and support columns are intactbase64_image

            2、 機柜型號、規格,安裝位置,應符合設計要求。  3、 機柜安裝垂直偏差度應不大于3mm,水平誤差不應大于2mm。幾個機柜并排在一起,面板應在同一平面上并與基準線平行,前后偏差不得大于3mm;兩個機柜中間縫隙不得大于3mm。對于相互有一定間隔而排成一列的設備,其面板前后偏差不得大于5mm;4、 機柜的各種零件不得脫落或碰壞,漆面如有脫落應預以補漆,各種標志應完整、清晰;5、 機柜安裝應牢固,有抗震要求時,按施工圖的抗震設計進行加固;6、 機柜不宜直接安裝在活動地板上,宜按設備的底平面尺寸制作底座,底座直接與地面固定,機柜固定在底座上,然后鋪設活動地板;7、 安裝機柜面板,架前應預留有800mm空間,機柜背面離墻距離應大于600mm,以便于安裝和施工;8、 壁掛式機柜距地面宜為1200mm;9、 機柜內的設備、部件的安裝,應在機柜定位完畢并固定后進行,安裝在機柜內的設備應牢固10、 機柜上的固定螺絲、墊片和彈簧墊圈均應按要求緊固不得遺漏;11、 懸掛式壁掛安裝應安裝在平整堅固的墻面上,距離地面少300mm,保持與墻面水平、垂直,垂直偏差應小于3mm。12、 墻體上開孔應避免破壞墻體內管線,開孔深度不得低于70mm,固定機柜所用膨脹螺絲釘不得少于4個(懸掛式C型機柜為6個)。必要時須在機柜下放置支撐物,以保證機柜的穩固。13、 落地式柜體安裝,安裝基座時要綜合考慮機柜的開門方向和操作便利性,優先考慮配線艙的開門方向。設備艙門和配線艙門必須能完全開啟。14、 機柜要做好防雷接地保護。15、 柜體安裝完畢應做好標識,標識應統一、清晰、美觀。機箱安裝完畢后,柜體進出線纜孔洞應采用防火膠泥封堵。做好防鼠、防蟲、防水和防潮處理。

            2. The cabinet model, specifications, and installation location should meet the design requirements. 3. The vertical deviation of cabinet installation should not exceed 3mm, and the horizontal error should not exceed 2mm. Several cabinets should be placed side by side, and the panels should be on the same plane and parallel to the reference line. The front to back deviation should not exceed 3mm; the gap between two cabinets should not exceed 3mm. For equipment arranged in a row with a certain distance from each other, the front to back deviation of the panels should not exceed 5mm; 4. All parts of the cabinet should not fall off or be damaged, and if the paint surface falls off, it should be repainted in advance. All markings should be complete and clear; 5. The cabinet installation should be firm, and if there are seismic requirements, reinforcement should be carried out according to the seismic design in the construction drawing; 6. The cabinet should not be directly installed on the raised floor. It is advisable to make a base according to the bottom plane size of the equipment, fix the base directly to the ground, fix the cabinet on the base, and then lay the raised floor; 7. Install the cabinet panel, with a reserved space of 800mm in front of the rack, and the distance between the back of the cabinet and the wall should be greater than 600mm for easy installation and construction; 8. The wall mounted cabinet should be 1200mm above the ground; 9. The installation of equipment and components inside the cabinet should be carried out after the cabinet is positioned and fixed, and the equipment installed inside the cabinet should be firm. 10. The fixing screws, washers, and spring washers on the cabinet should be tightened as required without omission; 11. Suspended wall mounted installation should be installed on a flat and sturdy wall surface, at least 300mm away from the ground, kept horizontal and vertical to the wall, with a vertical deviation of less than 3mm. 12. Holes on the wall should avoid damaging the pipelines inside the wall, and the depth of the holes should not be less than 70mm. The number of expansion screws used to fix the cabinet should not be less than 4 (6 for suspended C-type cabinets). If necessary, supports must be placed under the cabinet to ensure its safety and stability. 13. When installing a floor standing cabinet, the opening direction and ease of operation of the cabinet should be considered comprehensively when installing the base, with priority given to the opening direction of the wiring compartment. The equipment cabin door and wiring cabin door must be able to be fully opened. 14. The cabinet should be well protected against lightning and grounding. 15. The cabinet should be properly labeled after installation, and the labeling should be uniform, clear, and aesthetically pleasing. After the installation of the chassis, the cable holes in and out of the cabinet should be sealed with fireproof adhesive. Take measures to prevent rodents, insects, water, and moisture.

            二 機柜內設備的安裝布局及要求 機柜內設備的安裝布局1、 機柜由上到下主要分為四個區域:交流分配單元、配線架、有源設備、光纜終端盒。

            Installation layout and requirements of equipment in the second cabinet: 1. The cabinet is mainly divided into four areas from top to bottom: AC distribution unit, distribution frame, active equipment, and optical cable terminal box.

            2、 交流配電單元從性的要求放在機柜的上端。3、 語音及網絡配線架安裝在易于操作的位置,放在交流配電單元的下面。4、 配線架往下為有源設備區:差不多的設備根據功能及線纜連接需要安排位置,比如交換機、路由器,光端機,網橋,三者是一一連接的,為了防止信號線的交叉及功能區域的易于維護,的排列順序從下往上是光端機->網橋->路由器->交換機。大的設備安裝在機柜下部,并且使用機柜托盤承重。光纖收發器由于體積小,數量多,無法在機柜里面固定安裝,也放在托盤上安裝。5、 層放光纜終端盒,也放在托盤上安裝。

            2. The communication distribution unit is placed at the top of the cabinet for safety requirements. 3. The voice and network distribution frame is installed in an easy to operate location, under the AC distribution unit. 4. The active equipment area is located below the distribution frame: similar devices are arranged according to their functions and cable connections, such as switches, routers, optical transceivers, and bridges, which are connected one by one. In order to prevent signal line crossing and facilitate maintenance of functional areas, the best arrangement order from bottom to top is optical transceivers ->bridges ->routers ->switches. Large equipment is installed at the bottom of the cabinet and supported by cabinet trays. Due to their small size and large quantity, fiber optic transceivers cannot be fixedly installed in cabinets and are also installed on trays. 5. The bottom layer is equipped with fiber optic cable terminal boxes, which are also installed on trays.

            三 機柜內走線要求走線要求1、 纜線的布放應自然平直,不得產生扭絞、打圈接頭等現象,不應受外力的擠壓和損傷。

            Wiring requirements inside the three cabinets: 1. Cable laying should be natural and straight, without twisting, looping joints, or external compression or damage.

            2、 纜線兩端應貼有標簽,應標明編號,標簽書寫應清晰,端正和正確。標簽應選用不易損壞的材料。3、 在線纜預留方面,對于固定安裝的機柜,在機柜內不應有預留線長,預留線應預留在可以隱蔽的地方,長度在1m-1.5m之間。對于可移動的機柜,連入機柜的全部線纜在連入機柜的入口處,應少預留1m,同時各種線纜的預留長度相互之間的差別應不超過0.5m。4、 纜線終接后,應有余量。5、 光纜布放宜盤留,預留長度宜為3~5m,有特殊要求的應按設計要求預留長度。6、 不同電壓等級,不同電流類別的線路應分開布置,分隔敷設。7、 引入機柜內的纜線應從機柜的下方進入機柜,沿機柜后方兩側立桿向上引入配線架,卡入跳線架連接塊內的單根線纜色標應和跳線架的色標相一致,大對數線纜按標準色譜的組合規定進行排序8、 接線端子各種標志應齊全,數據配線架及交換機設備安裝完成后,標貼機打標簽:注明對應房間號以及端口號9、 纜線在終接前,必須核對纜線標識內容是否正確10、 纜線中間不允許有接頭11、 纜線終接處必須牢固、接觸良好12、 纜線終接應符合設計和施工操作規程13、 對絞電纜與插接件連接應認準線號、線位色標,不得顛倒和錯接14、 尾纖不能用扎帶,尤其不能扎的太緊,用專用的綁扎帶,如:魔束帶

            2. Both ends of the cable should be labeled with numbers, and the label writing should be clear, upright, and correct. Labels should be made of materials that are not easily damaged. 3. In terms of cable reservation, for fixed installation cabinets, there should be no reserved wire length inside the cabinet. The reserved wire should be reserved in a concealed place with a length between 1m-1.5m. For movable cabinets, all cables connected to the cabinet should be reserved at least 1m at the entrance of the cabinet, and the difference in reserved length between various cables should not exceed 0.5m. 4. After cable termination, there should be a margin. 5. The optical cable layout should be coiled and reserved with a length of 3-5m. If there are special requirements, the reserved length should be according to the design requirements. 6. Lines with different voltage levels and current categories should be arranged and laid separately. 7. The cables introduced into the cabinet should enter from the bottom of the cabinet and be led upwards along the vertical poles on both sides behind the cabinet into the distribution frame. The single cable color code inserted into the jumper frame connection block should be consistent with the color code of the jumper frame. The large number of cables should be sorted according to the combination regulations of the standard color spectrum. 8. All markings of the wiring terminals should be complete. After the installation of the data distribution frame and switch equipment, the labeling machine should label them: indicating the corresponding room number and port number. 9. Before terminating the cable, it is necessary to check whether the cable identification content is correct. 10. No joints are allowed in the middle of the cable. 11. The cable termination must be firm and in good contact. 12. The cable termination should comply with the design and construction operation regulations. 13. The connection between twisted pair cables and plug-in connectors should identify the wire number and wire. The color code should not be reversed or misconnected. 14. Cable ties should not be used for tail fibers, Especially not tied too tightly, it is best to use specialized binding straps, such as magic straps

            本文由   濟南機箱機柜 友情奉獻.更多有關的知識請點擊  http://m.cr4.com.cn/   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

            This article is a friendly contribution from Jinan Chassis Cabinet For more related knowledge, please click http://m.cr4.com.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

          首頁首頁 產品產品 電話電話 置頂置頂
          主站蜘蛛池模板: 亚洲中文字幕无码久久| 亚洲老熟女乱女一区二区| 蜜桃久久精品成人无码av | 国产成人综合久久亚洲精品| 国产欧美VA天堂在线观看视频| 亚洲中文字幕无线乱码va| 日韩美女视频一区二区三区| 亚洲成人av免费电影| 午夜福利在线观看| 国产特色一区二区三区视频| 亚洲AV香蕉一区区二区三区蜜桃| 无码国产精品一区二区免费式影视| 无码精品一二区三区免费不卡| 蜜臀av在线一区二区三区| 亚洲av片不卡无码久久| 蜜臀av一区二区三区在线| 国产成人精品自在线拍| 亚洲一级av毛片精品| 欧美亚洲一区二区三区在线| 欧美 国亚洲性色综合区| 国产91精品成人不卡在线观看| 欧美一级精品免费| 久久精品亚洲精品国产区| 亚洲精品国偷拍自产在线| 欧美成人无码a区视频在线观看| 高清性色生活片免费观看| 超碰aⅴ人人做人人爽欧美| 最新恐怖电影在线观看| 一本一道AV中文字幕无码| 欧美97久久人人模人人爽人人喊| 国产精品自产拍在线播放| 国产乱人伦偷精品视频| 中文字幕亚洲男人的天堂网络| 亚洲一区二区三区无码中文字幕| 三级三级三级A级全黄| 在线观看AV不卡网站永久| 亚洲春色校园小说| 精品国产成人国产在线观看| 白嫩少妇激情无码| 国产片AV片永久免费观看| 亚洲成年轻人电影网站WWW|