• <sup id="1zmse"><input id="1zmse"></input></sup>
          <label id="1zmse"><samp id="1zmse"></samp></label>
          <blockquote id="1zmse"></blockquote><label id="1zmse"></label>
          国产在线观看免费人成视频,国产欧美久久久精品影院,精品国产一区二区三区国产区,免费毛片在线播放中文,亚洲制服丝袜av一区二区三区,久久人搡人人玩人妻,国产一区二区四区不卡,亚洲夂夂婷婷色拍WW47
          您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

          服務熱線

          當前位置: 首頁- 新聞中心 > 客戶見證
          常見問題
          新聞中心

          高低壓成套設備安裝要注意什么?

          發布時間:2023-04-28 來源:http://m.cr4.com.cn/ 瀏覽量:

          1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
          During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
          2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
          2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinets can be fixed to the wall with expansion bolts, but hollow bricks or dovetail bolts should be embedded in the block wall or fixed with square head bolts. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
          3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
          電氣成套
          3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
          4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
          4. Connect the top of the distribution cabinet to the busbar, and pay attention to tightening the busbar matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
          5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
          After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
          6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
          6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
          首頁首頁 產品產品 電話電話 置頂置頂
          主站蜘蛛池模板: 特级小箩利无码毛片| 色综合夜夜嗨亚洲一二区| 欧美综合自拍亚洲综合图| 亚洲欧美精品综合一区| 中文字日产幕码三区国产| 日本乱偷中文字幕久久久| 成人性爱视频在线观看| 中国黄色一级视频| 免费无码成人AV片在线| 国产好爽…又高潮了毛片| 国产又粗又长又猛又黄| 色婷婷日日躁夜夜躁| 国内自拍视频在线一区| 日日超级碰碰碰碰久久久久| 日韩精品一色综合| 精品无码欧美黑人又粗又| 无码骚夜夜精品| 亚洲av国| 乱人伦中文无码视频| 少妇人妻中文久久综合| 久久久久人妻一区二区三区vr| 97久久精品人人做人人爽| 在线播放国产精品三级网| 香蕉在线精品一区二区| 吃奶揉捏奶头高潮视频| 亚洲综合精品第一页| 双乳奶水饱满少妇呻吟| 男女做爰无遮挡性视频| 国产普通话视频在线播放| 国产SUV精品一区二区四| 久久天天婷婷五月俺也去| 少妇特黄a一区二区三区| 鲁丝无码一区二区三区| 欧美第一黄网免费| 99精品国产一区在线看| 亚洲欧美人成人让影院| 久久不卡精品| 欧美日韩永久精品一区二区 | 久久综合亚洲色国产| 下面一进一出好爽视频| 国产又爽又黄又爽又刺激|