          MNS低壓配電柜安裝規(guī)范是什么?

          發(fā)布時(shí)間:2021-05-17 來源:http://m.cr4.com.cn/ 瀏覽量:

          1.安裝前對(duì)準(zhǔn)備工作的檢查
          1. Check the preparation before installation
          在安裝前,MNS低壓抽屜柜監(jiān)理工程師及甲方工程師要檢查進(jìn)場(chǎng)道路是否暢通,必要時(shí)要求要求總包單位修建簡(jiǎn)易運(yùn)輸通道與各安裝點(diǎn)連接,施工場(chǎng)地布置應(yīng)滿足文明施工的要求。同時(shí)還應(yīng)檢查安裝單位的施工機(jī)具安排狀況,督促安裝單位對(duì)施工機(jī)具進(jìn)行檢查,確保狀態(tài)良好。壓設(shè)備到達(dá)現(xiàn)場(chǎng)前,配電室、地溝、基礎(chǔ)槽鋼應(yīng)已完全竣工
          Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
          1)、配電室
          1) . distribution room
          配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細(xì)圖紙交予施工方(合同簽訂后2周內(nèi),重 點(diǎn)要落實(shí)客戶對(duì)圖紙的位置、內(nèi)容、完成時(shí)間確認(rèn)),并且在配電室建設(shè)過程中,我方或協(xié)作單位的技術(shù)人員要在現(xiàn)場(chǎng)監(jiān)督,避免施工錯(cuò)誤。(配電室建設(shè)大約需2周左右)
          Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                                     MNS低壓抽屜柜
          2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預(yù)留的設(shè)備風(fēng)道相對(duì)應(yīng),設(shè)備離墻的小距離要明確(距離太近,設(shè)備的柜門打不開)。(槽鋼焊接大約需2天,我方技術(shù)人員必須到場(chǎng)指導(dǎo))
          2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
          設(shè)備到達(dá)現(xiàn)場(chǎng):
          Equipment arrival at site:
          3)、若配電室、地基若未建好,低壓配電柜設(shè)備要有存放位置(要防雨或提供必要的防雨材料)。
          3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
          2.安裝
          2. Installation
          2.1各配電房門窗須嚴(yán)密,低壓配電柜房?jī)?nèi)清潔。
          2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
          感謝您的閱讀,希望以上內(nèi)容對(duì)您有所幫助,如您想了解更多精彩內(nèi)容請(qǐng)點(diǎn)擊我們的官網(wǎng):MNS低壓抽屜柜http://m.cr4.com.cn
          Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://m.cr4.com.cn .
          首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
          主站蜘蛛池模板: 欧美视频在线精品| 国产国拍亚洲精品永久软件| 国产精品老熟女一区二区| 国产又色又爽又黄的视频在线| 素人按摩偷拍中文字幕| 六月丁香婷婷去也| 亚洲AV午夜电影在线观看| 色欲狠狠躁天天躁无码中文字幕| 伊人色综合一区二区三区影院视频 | 国产高清乱码又大又圆| 日本在线观看| av便利店| 中文字幕AV在线一二三区| 精品欧洲av无码一区二区| 草莓麻豆av在线| 婷婷六月亚洲中文字幕不卡| 2021国产麻豆剧传媒仙踪林| 精品无码视频在线观看| 欧美性大战久久久久久| 亚洲成亚洲成网中文字幕| 亚洲精品国模一区二区| 国产91在线/亚洲| 亚洲熟女精品中文字幕| 日韩中文字幕国产精品| 国产精品丝袜亚洲熟女| 丝袜美腿亚洲综合第一区| 五十路老熟妇乱子伦免费观看| 亚洲综合图区经典日韩制服| 色八区人妻在线视频免费 | 最新的国产成人精品2022| 亚洲国产AV精品一区二区蜜芽| 欧美一卡2卡3卡4卡新区在线| 精品人妻av中文字幕乱| 国产粉嫩三级片粉嫩| 手机久草视频分类在线观看| 悠悠色成人综合在线观看| 2018国产大陆天天弄| 亚洲 欧洲 综合 另类小说| 久久久亚洲精品无码| 99精品人妻少妇一区二区| 人妻系列无码专区免费|